This page is not a catalogue of all lines and contracts, just those contracts that have a name. Not sure what this page is for but it had to be split out from the series page as part of disentangling the confusion between contract designations and tower suite designations. The entries are only in the vaguest hint of a meaningful order, as virtually nothing is known about any of these contracts, and in most cases the applicable dates are not known.
The entries below can be entire regional grid contracts, whole new lines and presumably also diversions and truncations of lines. Many of the contracts are found only as annotations on one or two drawings of existing tower types, with no direct indication of what the towers were used for.
For tower design contracts, see the drawing number ranges page.
See the regions page for a guide to the regions and their abbreviations and prefixes.
Contract numbers
Contracts originally took the name of the region followed by a type code and a sequence number. Tom Gloag has identified the following type codes:
- PL
- Overhead Lines
- PT
- Transformers
- PS
- Switchgear
- PF
- Foundations and Groundworks
- CR
- Control Room
Tower line contracts were given either a “PL” or an “SL” number, where “PL” is believed to denote “primary line” (132 kV) and “SL” is believed to denote “secondary line” (33 and 66 kV). That would suggest that there should also be “ST” (for secondary transformers), “SS” (for secondary switchgear) and “SF” (for foundations and groundworks) but at present this remains speculative.
By way of an example, the well-known SWE PL16 contract is the 16th primary line (132 kV) contract within the South West England and South Wales region, noted for a new tower type that became a national standard across the UK. These contracts began with the construction of the original national grid in the late 1920s and early 1930s, with a separate PL1 contract for each region.
The PL and SL numbers are only unique within a region: MEE PL1 is completely separate from (for example) CE PL1, and those two contracts didn’t even use the same type of towers. The “SWE” in “SWE PL16” is frequently dropped in the name of the tower type, but the contract (the line from Andover to Bournemouth via Salisbury) was specific to the SWE region.
Following nationalisation, a new numbering system appears to have been chosen, derived from the form “T(x) Ly”, where x denotes the applicable area electricity board and y is the contract number relative to that region. Normally an organisation abbreviation such as K&D (Kennedy and Donkin) or CEGB appears in the middle of the contract number. The L numbers again are unique only to the region. The L66/89 type took its name from the T(12) BEA – L66, Clyde’s Mill–Carlisle–Stella. The same is almost certainly true of L34 although this remains to be verified.
Anomalies
There are a few anomalies. Two contracts so far use “WM(EL)” instead of the predicted (but unconfirmed) T(7) for the Midlands Electricity Board. “WM” appears to denote “West Midlands” but the meaning of the “EL” remains a mystery.
The J L Eve S123 drawings—additional terminal tower configurations for J L Eve C534—are annotated “S.E.E. - L16”, which does not make sense. There is no other evidence for a L-numbered contracts within the CEB regions. This is potentially how C534 got its alternative designation of “L16” but this too remains unconfirmed.
Primary Lines
Original CEB PL contracts, plus later contracts for 132 kV and above.
| Contract | Tower type | Region / route / project | Route code | Date | Ref |
|---|---|---|---|---|---|
| CS-PL1 | CS-PL1 (Milliken L145) | Original grid: Central Scotland | From 1928 | ||
| SEE PL1a | GEC/Pirelli-General (“PL1a”) | Original grid: South East England | From 1928 | ||
| SEE PL1(b) | SEE PL1(b) | Original grid: South East England | From 1928 | ||
| CE PL1 | SS-PL1 (Milliken T161) | Original grid: Central England | |||
| NWE PL1 | SS-PL1 (Milliken E112) | Original grid: North West England and North Wales | |||
| MEE PL1 | GEC/Pirelli-General (same type as SEE PL1a) | Original grid: Mid-East England | From 1929 | ||
| SEE PL2 | CS-PL1 | ||||
| NWE PL2 | NWE PL2 (Milliken E111) | From 1930 | |||
| NEE PL1 | SS-PL1 (Milliken E136) | Original grid: North East England | From 1930 | ||
| SWE PL1 |
SS-PL1 (Milliken E141) S2 is a custom Callender’s design |
Original grid: South West England and South Wales | From 1930 | ||
| EE PL1 | SS-PL1 (Milliken E142) | Original grid: East England | From 1930 | ||
| SS PL1 | SS-PL1 (Milliken E164) | Original grid: South Scotland | From 1931 | ||
| SWE PL2 | SEE PL1a? | ||||
| Spey Valley | Blaw Knox K1576 | Tummel Bridge–Keith | From 1936 | ||
| CE PL3 | CE PL3 | ||||
| CE PL4 | PL4/WGR | ||||
| WGR PL1 | PL4/WGR | Carlisle–Galashiels | V | ||
| SEE PL7 | PL7 | ||||
| NWE PL7 | Blaw Knox K5735 | Fylde–Hillhouse | |||
| MEE PL6 | PL7? | ||||
| EE PL3 | PL7 | “Ipswich–Stowmarket” (unclear; now mostly PL16) | 1 | ||
| NWE PL6 | PL7? | 1 | |||
| MEE PL9 | PL7 | Osbaldwick–Melrosegate | 1 | ||
| NWE PL10 | PL4 | Natland–Barrow-in-Furness | Wartime? | ||
| SWE PL9 | Blaw Knox K5297 | WWII contract, possibly the rerouting of Bridgwater–Exeter for Norton Manor supply depot | At least 1940 | ||
| SWE PL10 | PL7? | Wartime diversion/alterations | Wartime | 1 | |
| SWE PL11 | PL7? | Wartime diversion/alterations | Wartime | 1 | |
| MEE PL12 | PL7? | 1 | |||
| MEE PL13 | PL7? | 1 | |||
| NWE PL12 | PL7? | 1 | |||
| SEE PL17 | PL4 | “Swindon” | Ca. 1944? | ||
| SWE PL16 | PL16 | Andover–Salisbury–Bournemouth | Ca. 1947 | ||
| [illegible] – L17 | PL7 | Crewe–Knutsford | 1 | ||
| T(3) K&D – L20 | SEE PL1(b) | Christchurchurch–Nursling/Bournemouth [sic] | 5 (S2) | ||
| T(12) BEA – L36 | PL7 | Carrington–Broadheath–Sale (partial) | 1 | ||
| T(12) BEA – L66 | L66/L89 | Clyde’s Mill–Carlisle–Stella | Ca. 1952 | ||
| T(2) BEA – L136 | SEE PL1(b)? | Littlebrook–Hastings diversion | 5 (D2) | ||
| PL7? | 1 | ||||
| T(2) M&M L4 | PL7? | Brighton–Worthing | PSA | ||
| Three Bridges–Brighton | PRA | 1 | |||
| T(8) K&D L8 | J L Eve L3 | South Wales area: likely Pyle | Ca. 1954 | ||
| WM(EL) L27 | J L Eve L3 | Stourport–Ludlow | ? | ||
| T(3) CEA – L217 | PB | Poole–Shaftesbury | PZA | Ca. 1956 | |
| T(11) CEA – L213 | PB | Husthwaite–Wormald Green | Ca. 1956 | ||
| T(6) CEA – L236 | Blaw Knox K4611 | Spondon–Annesley–Chesterfield uprating from 66 to 132 kV | Ca. 1958 | 2 | |
| T(2) CEA – L256 | PL7? | West Weybridge–Staines | Ca. 1958 † | 1 | |
| WM(EL) L52 | Eve C534 | Kitwell–Longbridge | Ca. 1960s | 6 | |
| T(1) CEGB L273 | Eve C534 | Belvedere & Lessness | ? | 4 | |
| T(2) CEGB – L280 | SEE PL1(b)? | 132 kV line mods – Northfleet | 5 (D2) | ||
| PL7? | 1 | ||||
| T(3) CEGB – L293 | Various | Poole–Wareham 132 kV line | 1965 | HW | 7 |
| T(4) CEGB – L300 | ? | Plymouth - Paignton - Newton Abbot / Exeter (possibly alterations only) | ? | 3 |
† The CEA only existed between 1955 and 1957, and since L236 is already dated to after 1957, L256 is presumably going to be around the same time.
References:
- Annotations to Watsham’s SEE PL7 drawings
- Blaw Knox K4611 drawing XM1631-50A, GA&ED of type DC tower outriggers for 132 kV operation
- Annotation to Blaw Knox K1201 drawing XM2051-28, GA of S10° tower
- Eve drawings, thus far DT sealing end platform only
- Annotations to SEE PL1(b) drawings
- Annotation to J L Eve C534 drawing C534/121F
- 47/3057 and HW tower schedule
Mysteries
The first section of route HW, T(3) CEGB – L293 (Poole–Wareham), from the junction with HH and HJ up to the first substation, uses a random assortment of towers, suggested to be the result of using up “strategic spare” towers from other lines, that were left unused, taking up space, and slowly rusting away. The tower schedule notes the following types in addition to the primary type (“Blaw Knox PL16”) used on this line:
- “Pirelli General PL1”
- “Blaw Knox PL5 W.G.R.”
- “Watshams PL7”
- “Blaw Knox PL20”
- “BK PL35”
- “Blaw Knox PL6”
None of the regions are given for these. It’s unclear how much of this route could be observed on foot. What few towers are near roads do not all match up with what the tower schedule claims they are, so it’s uncertain exactly what was erected where. HW18 is listed as “Blaw Knox PL35 DD2 Modified Peak” but in reality it is a PL4/WGR D2. HW19 “Pirelli General PL1” is an SWE PL16 (K8323) D2 with custom bracing for the top crossarm. HW16 is the same designation as HW18 (PL35) and the same tower type as HW19. “Pirelli General PL1” however is verified by an annotation on the SEE PL1 D30 E10 and E20 stress diagrams drawing, no. 6259. (Note that the “a” in SEE PL1a was not originally present on the drawings and was added afterwards to some but not all.)
Secondary Lines
33 kV and 66 kV on lattice towers, mistakenly referred to as “pre-Grid” towers. The expansion of “SL” as “secondary line” is unconfirmed, but PL contracts were all 132 kV and all SL contracts were for towers designed to support 33 and 66 kV (with the voltage often not noted, and ambiguous given the way that SL towers were designed, with crossarm spacing set both by voltage and by environmental conditions).
| Contract | Tower type | Route | Route code | Date | Comments |
|---|---|---|---|---|---|
| MEE SL1 | Milliken E102 | “Lincolnshire area” | From 1929 | ||
| MEE SL2 |
J L Eve C15 0.1□″ SCA J L Eve C15 0.15□″ SCA |
From 1929 | Seems to have been treated as one contract | ||
| NEE SL1 | Darlington–Northallerton | HO-SA | |||
| Malton–Scarborough | HO-SC | ||||
| Malton–Whitby | HO-SD | ||||
| Harton–Sunderland | HO-SE | ||||
| Sunderland–Dunston | HO-SF | ||||
| Dunston–Hebburn | HO-SG | ||||
| Hebburn–Harton | HO-SH | ||||
| NWE SL2 | Milliken T163 | ca. 1929 | Also SL2A | ||
| SEE SL2 | Watshams | ca. 1929 | Only recovered drawing is the D60/DT, same tower as in SEE SL3 | ||
| SEE SL3 | SEE SL3 | ca. 1930 | D60/DT as SEE SL2 | ||
| SWE SL2 | Milliken E177 | ca. 1932 | Apparently also SWE SL3 | ||
| SEE SL4 | SEE SL4 | ca. 1934 | |||
| NWE SL4 | NWE SL4 | ca. 1936 | |||
| SWE SL9 | J L Eve C333 | Bath–Melksham | Drawings appear to have been drawn in 1936 and approved in 1948 | ||
| SWE SL10 | “33 kV at Salisbury (132 kV)” | ||||
| SEE SL8 | SEE SL8 | Rayleigh–Southend | Only the gantry drawing recovered | ||
| SWE SL11 | Blaw Knox K9906 | ca. 1947? | |||
| SWE SL4 | Blaw Knox K9906? | SL4 noted on the K9906 D30 GA diagram instead of SL11 | |||
| NWE SL9 | Watshams 132 kV? | Copies of the SEE PL7 D10 and D30 drawings were found annotated “N.W.E. - P.L.6 & S.L.9.”; these are 132 kV towers so it’s not clear what SL9 encompassed. | |||
| NWE SL15 | SEE PL1(b)? | Annotation on the D60 drawing (as above, this is a 132 kV tower on an SL line) |